How to deal with sludge intelligently when the thick layers are hindering boating and when you need to restore a natural habitat as it was historically.
Read how TenCate Geotube® dewatering dealt with the volume and tackled the problems.
Geotube® Dewatering of Submerged Stormwater Pipe Sediments at Brisbane River
Transforming Wastewater Impoundment Into a Reservoir Lake with Geotube® Dewatering
Remedial Dredging of Lake Dianchi with Geotube® Dewatering
Environmental Remediation of Melaka River with Geotube® Dewatering
Close to the heart of the lagoon of Venice, the industrial harbor of Marghera, contained high levels of PCB contaminated sediments, the decision was made to remove the sediments.
Zuthphen de Mars is an industrial harbor, situated between the IJssel River and the Twente canal. The city wanted to improve accessibility of the river and the harbor.
At the Fox River site, Geotube® dewatering technology is part of an operation that involves dredging and dewatering more than 750,000 cubic yards of river sediments contaminated with PCBs.
A New York City power generating plant faced a difficult problem. Sitting on the East River in Brooklyn, the plant’s cooling water intake tunnel was clogged with years of silt from the river.