Land Reclamation with Geotube® systems
Construction of The Longest Sea-Crossing Bridge with Geotube® systems, Vietnam
The installation of TenCate Geotube® systems began at the end of end April 2006 and was completed in December of the same year. In total 18,000 metres of TenCate Geotube® systems were supplied.
TenCate Geotube® systems from TenCate Geosynthetics were selected to construct the core of the guide dams required to create a shelter for vessels to enter from the Markermeer into the Naviduct.